Two power generating units arrived at Tripoli.
Pulbished on:
Tripoli, 22.01.2017(Lana) Two power generating units with 60
megawatt capacities arrived in Tripoli port Saturday.
Communications and Media Department at the Presidency Council
said the units would be installed and be integrated into the national
grid within two months.
The arrival of the two units are in line with the efforts made by
the Presidency Council of the GNA to counter the power's deficit in
the country, it said.
=Lana=